Back to All Events
Join Tuesday at 9AM for a Hilly ride!
Start at Beals Point, ride to Folsom Dam and climb the Dam road 6 times. Loop down through Folsom to Greenback Bridge and Black Miner’s Bar, and back to Beals Point.
Repeat 1 more time for approximately 44 miles and 3500 feet of climbing.
Roll out at 9:15 for the 1st loop, 10:45 for the 2nd loop.
You can do as many or as few repeats as make sense for you!
Bathrooms available at Beals Point and just out of Black Miner’s Bar.
Host: Vince Jones